McK
McK Cement
mckcement.com

Prepared for Roberto Polit & Ralph Reyes · Amrize

Your next kiln upset should happen on a simulator.

CCR Academy puts every control room operator through the bad nights before they happen, with a coach after every drill.

McK Cement · mckcement.com · October 21, 2026

Our 30 minutes

Mostly your time. Then the kiln.

5min

Your priorities

What does performance mean on your scorecard this year?

15min

A live drill you pick

The upset your newest operators struggle with most, start to finish, with the coach debrief.

10min

Fit and next step

Decide together whether a small pilot makes sense.

9:309:359:5010:00

If this is not a fit, say so and we part friends.

McK Cement · mckcement.com

Our starting view · correct us

Amrize is selling every ton it can make.

+5%

Cement volumes in Q2 2026, on data center, energy and infrastructure demand

660k

Tons of new capacity at Ste. Genevieve, with Midlothian and Exshaw next

+25%

More people at Saint-Constant after its $610 million modernization

18

Cement plants across North America, 13 in the US, each with its own kiln, fuels and screens

“

Cement manufacturing is preferred but not required.

Amrize control room operator posting · Portland plant, Florence, CO

New people in the chair, on kilns that are sold out. That is when a bad night costs the most.

Sources: Amrize Q2 2026 results · Amrize newsroom · Amrize careers · S&P Global

Anatomy of a bad night

Same ID fan surge. Two operators.

UntrainedLearned on the job
02:04

Sees draft falling. Pushes the ID fan harder.

02:06

Fan vibration climbs. CO rises. The hood goes positive.

02:09

The fan trips on vibration and takes the kiln with it.

KILN DOWN · ~6 HOURS$42,000

of clinker lost, before restart fuel and refractory stress

TrainedRan it on CCR Academy
02:04

Calls it a surge, not a draft problem. Backs the fan off.

02:05

Trims feed and fuel to match the air the kiln has.

02:12

CO comes back down. Calls maintenance on the fan.

KILN RUNNING~7 t/h

given up on purpose, for a short time

What does that night cost on your kiln? Let's put in your numbers.

At 100 tons/hour and $70/ton margin · McK Cement estimates

Your numbers · type in what they tell you

What one bad night costs your kiln.

t/h
$/t
h
$
/yr
lines
One bad night $67,000
Lost clinker $42,000Restart $25,000
Per hour down
$7,000
Per day down
$168,000
Per year, all lines
$134,000
If trained crews avoid 25% of those trips
$33,500/yr

Estimates for discussion. A market-limited plant can often make up lost clinker later; restart costs apply either way.

McK Cement estimates · defaults: 100 t/h, $70/t, 6 h, $25,000 restart

Who we are

Built by a cement man, not a software company.

5cement plants managed by Gerry McKervey
40+years, quarry to kiln to boardroom
23real-world drills in CCR Academy
EN · ESplain words, by text or voice
Gerry McKervey · B.S. Mining Engineering, University of Missouri-Rolla

Live demo · drill U-02

2:04a.m.

The ID fan starts to surge.

  1. The first move
  2. The radio call to the field
  3. How the coach explains the result
Watch for these three things

Where it fits

Inside your certification program, not instead of it.

CRO certification levels Yours
Instructor-led simulator sessions compareYours
CCR Academy: everyday practiceEvery shift · every crew
E-learning on process basics Yours
On-the-job coaching from veterans Yours

Practice on any shiftIn a web browser. No DCS link, no IT project.

Upsets on demand23 drills, with a coach debrief after each one.

Tests that change every timeNo help, and a different upset each run.

A readiness record per operatorReady, Close or Needs work, by crew. How it's graded

We give every operator more reps. Your trainers stay in charge.

What your pilot report could look like

One crew, twelve weeks on the simulator.

Week 12 / 12
Crew average drill score0 to 100 · dashed line = Ready
Crew readiness

Plant numbers we'd watch with you. You set the targets.

Unplanned kiln stopsyour baseline → your target
Free lime variabilityyour baseline → your target
Heat use, MMBtu/styour baseline → your target
Time to CRO sign-offyour baseline → your target
The measures are ones CCR Academy records today.

Proposed next step

A 90-day paid pilot, measured your way.

WEEK 0

Tune

Your kiln line in the simulator. How

WEEKS 1–2

Baseline

Every operator tests cold

WEEKS 3–10

Practice

Drills and shift runs inside your certification steps, with a coach after each one

WEEKS 11–12

Report

Same tests. Results against your criteria

WHO

New and developing CROs at one or two plants. A plant hiring now, or one adding capacity.

MEASURE

You pick: readiness, test scores, time to sign-off, upset response. Scoring

TERMS

90 days, paid. The pilot fee is credited to a yearly plan.

McK Cement · mckcement.com

Straight talk

What this is, and what it is not.

IT IS
  • Practice on real upsets
  • A coach after every drill
  • Readiness evidence that sits beside your training records
IT IS NOT
  • A replacement for your trainers, field time or classroom simulator
  • Connected to your DCS, ever
  • Plant sign-off. Your competent person still signs
McK Cement · mckcement.com

Next steps · fill in with them

Agree the plan before we hang up.

StepOwnerWhen
Gerry McKerveygerry@mckervey.commckcement.comQuestions? Appendix
Click any owner or date to edit it live

Appendix · questions you may have

The details, one click away.

Click a tile to jump. Back returns you to where you were.

Appendix · we already have a simulator

Keep SIMULEX for class. Add the reps in between.

 Classroom simulator, e.g. KHD SIMULEXCCR Academy
ScopeFull plant, raw materials to cement silosKiln line: preheater, calciner, kiln, cooler, ID fan. No finish mill model yet
ModelReal-time models, soft PLC logic, full interlocks, 20+ years refinedBrowser model with lags, noise, equipment limits and burner interlocks, built around drills
FormatInstructor-led classes of several days10 to 60 minute drills and shift runs, on any shift
AccessLicensed seats, often bookedAny browser; unlimited operators per kiln line
FeedbackAn instructor evaluatesAutomatic grade, safety gates, coach debrief, expert-run overlay
ProofCourse completionTests, crew readiness board, training record export
Track record130+ LafargeHolcim licenses worldwideNew. No enterprise reference yet
Together

Before classDrills as homework

Between classesMonthly reps on costly upsets

After classTests show it stuck

New hiresDay-one drills in English or Spanish

Source: KHD SIMULEX product page. SIMULEX is a KHD Humboldt Wedag product.

Appendix · what upsets do you cover?

23 drills. The problems that cost plants money.

Kiln 8

  • K-01Coating collapse, kiln amp spike
  • K-02Clinker ring forming
  • K-03Ring collapse, material surge
  • K-04Cold kiln, high free lime
  • K-05Hot kiln, overburning
  • K-06Unstable burner flame
  • K-07Startup, ramp to full production
  • U-04Alternative fuel swings

Preheater 5

  • P-01Cyclone buildup forming
  • P-02High CO at calciner, short of air
  • P-03Preheater false air spiral
  • P-04Cyclone jam, meal not reaching kiln
  • P-05Downdraft calciner running hot

Cooler 3

  • C-01Snowman at cooler inlet
  • C-02Red river, poor clinker cooling
  • C-03Undergrate pressure drop

Mills 4

  • M-01Coal mill fire risk, rising CO
  • M-02Baghouse DP spike, cleaning fault
  • M-03Bag failure, dust breakthrough
  • M-04Raw mill trip, kiln interaction

Utilities 3

  • U-01Power dip, partial trip recovery
  • U-02 · TODAY'S DEMOID fan surge, draft loss
  • U-03False air leak

Plus shift runs: 20 to 60 simulated minutes with 2 to 4 problems at random times, so operators learn to spot trouble without being told a drill has started. Plants can add custom drills for their own trouble spots.

Each drill has an answer key: the ideal moves, the tempting wrong moves and the hard safety rules

Appendix · is it accurate for our kiln?

Tuned to your kiln line, reviewed by your people.

1

You send

  • Preheater stages and calciner type
  • Cooler, fuels and alternative fuels
  • Screenshots of your control screens
Amrize plant contact
2

We build your profile

  • 4, 5 or 6 stages; in-line or downdraft calciner
  • Alternative fuel at the burner or calciner, whole tires
  • Your screen colors; US or metric units
McK Cement · days, not months
3

Ralph reviews

  • Runs the drills on your kiln
  • Checks the trends look like home
  • We adjust until he signs off
Your training lead
4

Replay your own upsets

  • Export a historian CSV of a real event
  • Crews watch it unfold and call it
  • Then see what really happened and what the crew did
Any plant, any trip

A teaching model, not a digital twin. It behaves like your kiln where the drills need it to: lags, noise, equipment limits and interlocks.

McK Cement · mckcement.com

Appendix · how is an operator graded?

Graded the same way, every run, every plant.

Safety first

Break a hard safety rule and the run fails its safety gate, whatever else went right.

Three scores

Safety, economy (fuel and air per ton) and production. Shift runs add steady running and response time.

Help costs points

Hint −0.5 · next move −1.5 · show root cause −3. Crutches show up in the grade.

Test mode

No help. The upset arrives stronger or weaker and further along, different every time.

Expert overlay

The textbook run of the same drill is drawn over the operator's own trends.

Ready means

  • Every safety drill at B or better
  • Three or more tests passed
  • A shift run at B or better
  • No safety gates in the last 30 days
ReadyCloseNeeds work

We can set this rule to match your CRO certification levels.

Records print and export to CSV to support an MSHA Part 46 program. They do not by themselves show compliance; your competent person signs.

Appendix

How plants train board operators today.

CapabilityOn-the-jobSeminar + simulatorCustom plant simulatorCCR Academy
Runs in a browser, no IT projectNoNoNoYes
Coach debrief after every drillNoNoNoYes
Available every shift, every crewPartlyNoPartlyYes
Readiness record per operatorNoPartlyPartlyYes
Time to first drillYearsNext sessionMonthsSame day
Cost modelHidden~$2,600 per person plus travelSix-figure project (est.)Yearly fee per kiln line, unlimited seats

Already using a classroom simulator? See how the two fit together

Public vendor materials reviewed Sept 2026. Custom simulator cost is a McK Cement estimate.

Appendix · internal · show only if asked

Commercial options.

OptionProposed priceIncludes
Pilot$7,500 for 90 daysCredited to a yearly plan
Plant$24,000 per kiln line per yearUnlimited operators, standard model
Plant, tailored$36,000 per year + $15,000 tailoringYour kiln line tuned, your screens
Enterprise$18,000 per kiln line per year5 or more lines
Add-ons$2,500 per custom drill · $4,500 per on-site dayPlus travel
Fleet example18 lines × $18,000 = $324,000 per yearCovered by about 2 avoided lost days fleet-wide
Proposed pricing, October 2026 · hidden unless P is pressed
1 / 12 ← → to move